LSU Tiger Stadium South End Zone Expansion

our projects

LSU Tiger Stadium South End Zone Expansion

Work with us

location

Baton Rouge, LA

Client

Tiger Athletic Foundation

Market

Sports + Recreation

size

290,000 sq ft.

Contracted by Tiger Athletic Foundation (TAF) and delivered under the CMAR approach, this $78 million, 290,000 SF project completed the expansion to the south end zone at Tiger Stadium in Baton Rouge. TAF, a seasoned builder of major collegiate sports facilities, chose the Lemoine/Brasfield & Gorrie team based on their advanced pre-construction process that confirmed that the project would meet the tightly defined budget constraints and the critical opening schedule.

Making it the second largest in the Southeastern Conference and fifth largest in the nation, the project included the addition of an upper deck to the south end zone, renovations to the existing structure and an expansion of the stadium by more than 6,000 seats including a 3,000 seat stadium club, 70 skybox suites and 1,500 upper deck seats.

The Expansion Project is a true success story for cost control during pre-construction, as the Lemoine/Brasfield & Gorrie pre-construction team was successful at driving the project cost down over 11% between Conceptual Design and Construction Documents. However, more impressive, we were able to deliver an additional 20 luxury suites and 225 club seats beyond the original concept.

location

Baton Rouge, LA

Market

Sports + Recreation

Client

Tiger Athletic Foundation

size

290,000 sq ft.

Contracted by Tiger Athletic Foundation (TAF) and delivered under the CMAR approach, this $78 million, 290,000 SF project completed the expansion to the south end zone at Tiger Stadium in Baton Rouge. TAF, a seasoned builder of major collegiate sports facilities, chose the Lemoine/Brasfield & Gorrie team based on their advanced pre-construction process that confirmed that the project would meet the tightly defined budget constraints and the critical opening schedule.

Making it the second largest in the Southeastern Conference and fifth largest in the nation, the project included the addition of an upper deck to the south end zone, renovations to the existing structure and an expansion of the stadium by more than 6,000 seats including a 3,000 seat stadium club, 70 skybox suites and 1,500 upper deck seats.

The Expansion Project is a true success story for cost control during pre-construction, as the Lemoine/Brasfield & Gorrie pre-construction team was successful at driving the project cost down over 11% between Conceptual Design and Construction Documents. However, more impressive, we were able to deliver an additional 20 luxury suites and 225 club seats beyond the original concept.

Headline about a project to go here.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

next project

Shaw Center for Arts

our blog

LEMOINE News

Lorem ipsum is placeholder text commonly used in the graphic, print, and publishing

get started

LEMOINE provides you with only the necessary services that compliment your existing in-house capabilities. We are ready to get involved.

get started